The Metropolitan Rapid Transit or MRT is a rapid transit system serving the Bangkok Metropolitan Region in Thailand. The first section of the Blue Line between Hua Lamphong and Bang Sue opened in 2004 as Bangkok's second public transit system. The MRT is operated by the Bangkok Metro Public Company Limited (BMCL) under a concession granted by the Mass Rapid Transit Authority of Thailand (''MRTA''). Along with the Bangkok Mass Transit System (BTS, also called the Skytrain), and the Airport Rail Link (ARL), the MRT is part of Bangkok's rail transportation infrastructure. The MRT serves more than 240,000 passengers each day. It has 18 operational stations along 〔 of underground route. The Blue Line, officially the Chaloem Ratchamongkhon Line, is the only line currently in operation. As of 2011, two extensions of the Blue Line are under construction. When completed, the Blue Line will become a loop line around the centre of Bangkok, with an extension to Bang Khae on its western side. The MRT Purple Line is also under construction. It will connect Bang Sue with Nonthaburi in the north-west, and will be the first public transit line outside the Bangkok Metropolitan Administration. The MRT line is officially known in Thai as ''rotfaifa mahanakhon'' (รถไฟฟ้ามหานคร) or "metropolitan electric train", but it is more commonly called ''rotfai taidin'' (รถไฟใต้ดิน), literally, "underground train". The metro has a fleet of 19 trains; the 19th train entered service in October 2007 after a major accident. ==History== The MRT was constructed under a concession concept. For the first MRT line, officially known as Chaloem Ratchamongkhon or informally as the "Blue Line", most civil infrastructure were provided by the government sector, Mass Rapid Transit Authority of Thailand (MRTA), and handed over to their concessionaire under a 25-year concession agreement. Bangkok Metro Company Limited (BMCL) is the only private sector company that won a bid in MRTA's concession contract for the blue line. As MRTA's concessionaire, BMCL provides M&E equipment, including electrical trains, signalling systems, SCADA, communication, PSD, etc. for the subway project and fully operates the system. To maintain the system, BMCL has subcontracted in 10 years to Siemens which was the M&E system supplier since system opening and 7 years maintenance contract to two local maintenance services for north and south line. The construction of the first Bangkok Metro line, officially known as Chaloem Ratchamongkhon (Thai สายเฉลิมรัชมงคล) – "Celebration of Royal Auspice" – or informally as the "Blue Line", began on 19 November 1996. The project suffered multiple delays not only because of the 1997 economic crisis, but also due to challenging civil engineering works of constructing massive underground structures deep in the water-logged soil upon which the city is built. The Blue Line was opened for a limited public trial period of several weeks starting on 13 April 2004. On 3 July 2004 the line was officially opened at 19:19 local time by HM King Bhumibol and Queen Sirikit, who were accompanied by other members of the royal family. Within 30 minutes of its opening, sightseers filled the system to its maximum capacity, but after the initial rush ridership has settled down to around 180,000 riders daily — considerably lower than projections of over 400,000, despite fares being slashed in half from 12-38 baht to 10-15 baht per trip. From 2006 until 2008, fares ranged between 14-36 baht per trip. The fare was raised to 16-41 Baht on 1 January 2009. Current ridership (2012) stands at 240,000 on weekdays.〔 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「MRT (Bangkok)」の詳細全文を読む スポンサード リンク
|